Each one has a single job, and all of their work reaches you through the lead agent. See every specialist.
Runs first. Confirms our reference data (utility rates, incentives, local rules, cost benchmarks) covers your buildings. Gaps are researched, cited to the source document and reviewed before any figure uses them.
Works from: Our shared reference library, filed tariffs, published regulations and cost data
Establishes what is actually in the building: equipment, envelope and condition, with a page reference for every fact. Lists the capital events you already face, such as a roof replacement or equipment at end of life.
Works from: Your documents, building stock data, satellite and street imagery
Builds a physics energy model from the documented building, calibrates it to your bills, and bounds it against peer buildings. Then simulates the savings of each measure in the order they are installed, keeping the rest of the building as it was sized.
Works from: Your utility data, weather data, energy simulation and peer benchmarks
Sets the carbon pathway and stranding year (carbon first, energy beside it), the grid's forward emissions, and your position against any local building performance standard, including fine exposure. The carbon headline is a snapshot at your exit year, split into cleaner grid, efficiency and solar. Solar counts at full output, flagged where it is exported or its certificates are sold.
Works from: CRREM pathways, forward grid emissions, performance-standard regulations
Proposes, screens and costs the measures, tied to your capital events and to cited incentives, booked at the low end of each program and marked pending. Recommended measures are installed within your hold; later ones are listed as not recommended with rough figures. A cost with no benchmark comes from a named source, labelled unverified, with the quote to ask you for. Systems already installed stay in the baseline; they are never claimed as plan value.
Works from: Measure performance and cost benchmarks, incentive programs, utility rates
Builds the owner cashflow in one engine, in today's dollars: capex, incentives, the savings you keep, avoided fines and exit value. Reports IRR including exit against your hurdle (or NPV at the hurdle where no IRR solves), NPV at your discount rate, payback and the value bridge. A federal tax credit stays out of the base case unless you rule it in; its upside is stated.
Works from: The cashflow engine and your underwriting assumptions
Assembles the report from the specialists' outputs. Every measure in the report traces to the analysis. A figure that was not analysed stays blank and is named as a gap, never invented.
Works from: The report template and its automated checks
Recomputes every figure independently before the report is produced, then checks the finished report before you see it. A failed review stops the report; there is no override.
Works from: The same engines and data as the specialists, run separately